Cogeneration power plant in Kaunas
07.07.2020.
              Object built in 2019 using Tenax W 240 MW T2 with PVDF metal coating and 0.6mm thick metal, providing A + energy efficiency building requirements.
Total area covered with sandwichpanels – 15000 m2
Source: https://kkj.lt/
Used products
                                      
                                   
			 
                       
                       
                       
                        