ASKER PANORAMA, OFFICE BUILDING
18.01.2019.
              Object built in 2017 using SP TENAX MW 150 mm, inside the building internal walls.
Used products
                                      
                                  Object built in 2017 using SP TENAX MW 150 mm, inside the building internal walls.